The buildings’ heights would range from 46.20m to 138.35m, with minor revisions made in the 2023 SPA application. With the change in developer comes a new designer BDP Quadrangle has replaced TACT Architecture, At the same time, the proposal is growing vertically in 2021, it called for buildings ranging from 10 to 35 storeys, while as of October, 2022 the range is now from 12 to 42 storeys. It is approximately 17,158m² in area and runs southwest to northeast along the south side of the CP Rail corridor and an adjacent commuter parking lot.Īn aerial view of the site and surrounding area, image from submission to City of Toronto The stretch of land contains low-rise commercial units and paved parking. The site is an assembly of properties at 56, 58, and 60 Fieldway Road, located southeast from Kipling Avenue and Bloor Street West. Looking northwest to 56 Fieldway Road, design from March, 2023 by BDP Quadrangle for EllisDon Developments

The firm took on the site in August, 2022, resubmitting the Zoning By-law Amendment application for this site found in October, 2022, and now a Site Plan Approval (SPA) application as of March, 2023. Initially submitted to City of Toronto in Aiugust, 2021 by Stowe Holdings Ltd and Mountsfield Properties Inc, a revised proposal for the site is now being shepherded through the planning process by EllisDon Developments, an arm of the major construction firm EllisDon. Much has changed and much has stayed the same since UrbanToronto last wrote about a four-tower proposal at 56 Fieldway Road in the Six Points area of Etobicoke.